Took part in developing a new coffee roaster machine from concept to mass production, including the electrical panel and technical documentation.

Role
Electrical Engineering Intern (R&D)
Client / Organisation
PT Tata Rapika Globalindo
Period
Sep 2020 — Feb 2021
Sidoarjo
Coffee Roaster Machine Development

Impact in numbers

months in R&D
6
new product line
1
teams aligned
3

Overview

At PT Tata Rapika Globalindo I supported the R&D team developing a new product line: a coffee roaster machine. I was involved from concept, through assembling and testing the electrical control panel, to preparing for mass production.

Beyond the technical work I maintained the product documentation — specifications, test reports and design updates — so engineering, production and marketing worked from the same information.

Approach

  1. 1

    Helped design and assemble the electrical control panel

  2. 2

    Ran prototype tests and recorded the results

  3. 3

    Updated specification documents whenever the design changed

  4. 4

    Acted as an information link between R&D and production